Landfill Remediation – Kfar Saba Landfill

 

This landfill was a pirate site containing some 3,000 m3 of mixed waste, east of Kfar Saba, and as such was an environmental hazard. With the planning of the Trans-Israel Highway it became clear that the site lay directly in its path.
A.A. Engineers planned the site’s engineering remediation that was executed by the highway company and the Kfar Saba Municipality. The work consisted of the following main components:

  • External remodeling from a huge random hill (30 meters high covering 7.5 acres) to a geometrical structure, while erecting a 200 meter long, 10 meter high flexible supporting wall at the side of the highway.
  • Sealing to prevent rainwater penetration and wastewater formation. Construction of a layer of  landscaping soil supported by metal mesh over
     the  entire site surface.
  • Landscape remediation – planting stabilizing landscape plants over the site’s surface.
  •